国产精品天堂avav在线,亚洲精品无码专区,国产精品亚洲一区二区在线观看,亚洲av无码专区色爱天堂

Cross


Order Hotline
18968916333
15397399668

Industry news 網(wǎng)站首頁Industry news

Things to be aware of when the cross-cutting machine is finished

發(fā)布日期:[2018-12-30]     點擊率:

The cross-cutting machine can be used for the cutting of paper materials such as coated paper, coated paper, kraft paper and paper-plastic composite, plastic sheet, etc., especially suitable for the production of paper industry and paper processing industry. Then, when using the cross-cutting machine, it is necessary to carry out regular maintenance, so as to ensure the smooth running of the machine and the cutting quality of the product.

First of all, the cross-cutting machine should be installed in a place that is dry, ventilated, with good light and convenient operation. Secondly, after each operation, it is necessary to clean the dust and paper scraps on the machine in time, check the cutter and the grinding wheel, check whether there is any abnormality in the running part, and reasonably add the lubricating oil. Side by side net oil moisture high and water storage tank. Finally, it is necessary to cut off the power of the cross-cutting machine according to the operation requirements of the manual and maintain the computer operating system.

crosscutting machine

The basic daily maintenance of the cross-cutting machine, the general principle is that the inspection, cleaning, and lubrication maintenance work is fully in place to ensure that the various components of the equipment are in good condition. In addition, it is also important to improve the technical quality and level of the operators. It is necessary to be responsible for the operation of the control part. No one is allowed to operate without permission.

Do a good job of maintenance and maintenance. First of all, daily maintenance should be in place. The principle is to lubricate, clean, clean (no dust, no debris) in place to ensure that the sliding part of the equipment is in good condition. Followed by maintenance work, regular and irregular inspections of the rotating parts (especially for real-time monitoring of consumables). Regular adjustments are made, regularly replaced, and detailed records are made to extend the life of the equipment. Regular cleaning and inspection of the electrical parts should be carried out in a timely manner to eliminate hidden dangers.

Use high quality slitters and cross cutters. Improve the technical quality and level of the operator, and be responsible for the operation of the control part. No one can operate it without permission.

Tr

国产精品无码免费视频二三区| 少妇夜夜春夜夜爽试看视频| 久久久无码精品亚洲日韩蜜臀浪潮 | 成人免费无码大片A毛片抽搐色欲| 浪荡女天天不停挨cao日常视频| 人人爽天天碰狠狠添| 亚洲最大成人网色| 探花口爆颜射乳交日韩| 草莓视频在线观看18| 西西人体444www大胆无码视频| 日本精品αv中文字幕| 精品少妇人妻av无码久久| 欧美性大战久久久久久| 亚洲不卡无码永久在线观看| 7777精品伊久久久大香线蕉| 久久人妻无码一区二区| 欧美日韩无套内射另类| 18禁免费无码无遮挡不卡网站| 亚洲精品乱码久久久久久自慰| 欧美熟妇精品视频网免费观看| 欧美日韩国产精品自在自线| 国产日韩亚洲大尺度高清| 国产精品欧美成人| 无码毛片aaa在线| 亚洲欧洲免费无码| 免费拍拍拍网站| 天天色影网| 亚洲产国偷v产偷v自拍色戒| 日本乱子人伦在线视频| 亚洲精品午夜无码专区| 国产真实乱对白精彩久久| 久久午夜无码免费| 国产中文欧美日韩在线| 精品久久久久久无码人妻热| 少妇高潮水多太爽了动态图| 精品国偷自产在线视频| 爆乳女仆高潮在线观看| 国产精品污www一区二区三区 | 国产精品一区二区av| 在线看片免费人成视频久网下载 | 国产乱理伦片A级在线观看|